Fabrication:
Fabrication of mechanical parts of our switchgears is fully automated. Our integrated CAD/CAM software, CNC machines and NC machines join in from early stages to the final product fabrication. For the painting, in a completely automatic process all of panel doors and covers are first prewashed in big tubs and then coated by epoxy powder.
Testing:

Quality is one of the key factors of ADAK. In house testing of switchgears is done by Qualified &Skilled Engineers by up-to-date testing facilities available in house. Various quality checks are done at every stage of manufacturing to avoid any discrepancy or mistake. After final assembly & wiring, to make sure that switchgears meet the customer requirements, a joint witnessed testing will be conducted at our factory before the delivery. The testing procedure includes:

  • Visual inspection
  • Inspection of wiring and operation test
  • Dielectric test
  • Inspection of protective measures and electrical continuity of the protective circuits
  • Confirmation of insulation resistance
  • Copyright © 2016 Adak Behin Niroo | Unit 6, 10 Mokhberi St., Ashrafi Esfahani Hwy., Tehran, Iran +98 21 44998064